Hand over the information, not just the model.

Asset data structured, verified and exported so the operations team can use it on day one rather than rebuilding it.

COBie-compliant asset data, verified registers and CAFM-ready exports prepared for facilities handover.

All BIM services
What you receive

Deliverables, stated before we start.

Most handover data fails on the receiving end, not the issuing end. We work backwards from the CAFM or CMMS that will consume it, so the export loads instead of erroring.

Getting started

What we need from you.

Scope gaps are cheaper to resolve before modelling than after. These are the inputs that set the programme and the price.

Input 01

The CAFM or CMMS the data has to load into, and its import schema

Input 02

Employer's Information Requirements or asset data requirement matrix

Input 03

As-built models and the subcontractor data behind them

Input 04

O&M documentation set and the site's asset tagging convention

Delivered in
  • Revit
  • COBie toolkits
  • Navisworks
  • Autodesk Construction Cloud
  • Excel
FAQ

Digital twin & handover data — common questions.

Which FM systems can you target?

We work to the import schema of the receiving system rather than to a fixed list, and validate the export against that schema before issue.

Is the data verified against site?

It is verified against the information you can evidence — as-built models, subcontractor submittals and O&M data. Physical site verification is a separate scope we can include where access allows.

Do we need a full digital twin?

Usually not at handover. A structured, verified asset register is the foundation; live telemetry integration is a later decision that this data makes possible.