Programme in Primavera P6 or MS Project with a stable WBS
Sequence and cost, linked to the model.
Construction sequencing and quantity-linked cost workflows that make the programme visible and testable before work starts.
Link the model to the programme and the cost plan for sequencing, phasing, logistics and progress comparison.
All BIM servicesDeliverables, stated before we start.
4D is only useful when the model breaks down the way the programme does. We map the work breakdown structure to model elements first, so the simulation reflects how the job is actually built.
- Construction sequence simulation covering the agreed programme window
- Model-to-WBS mapping, documented so it can be maintained
- Phasing, temporary works and site logistics visualisation
- 5D quantity-linked cost model aligned to your cost breakdown structure
- Planned-versus-actual progress comparison at agreed data dates
- What-if sequence options for constructability or access decisions
What we need from you.
Scope gaps are cheaper to resolve before modelling than after. These are the inputs that set the programme and the price.
Model at a level of detail that matches the programme granularity
Cost breakdown structure and rate basis, for 5D
Site constraints, access routes and temporary works intent
- Bentley SYNCHRO
- Navisworks TimeLiner
- Revit
- Primavera P6
- MS Project
4D & 5D BIM — common questions.
Does my model need to be complete first?
No. It needs to be structured. A schematic model with a sound breakdown sequences better than a detailed model whose elements cannot be mapped to activities.
Is 5D the same as a cost plan?
No. 5D links quantities from the model to your cost structure. The rates, risk and commercial judgement stay with your cost team — we make the quantity side traceable to an element.
Can you update the sequence as the job moves?
Yes. Once the mapping exists, re-running against a revised programme is a maintenance task rather than a rebuild.
Usually scoped alongside this.
Most packages touch more than one discipline. These are the services that most often sit next to 4d & 5d bim.
BIM coordination & clash detection
Federated model coordination with prioritised clash reporting, tracked issues and accountable resolution.
View serviceQuantity takeoff
Model-based quantity takeoff mapped to NRM, CSI or your own cost codes, with reconciliation and change comparison.