BIM services · 4D & 5D BIM

Sequence and cost, linked to the model.

Construction sequencing and quantity-linked cost workflows that make the programme visible and testable before work starts.

Link the model to the programme and the cost plan for sequencing, phasing, logistics and progress comparison.

All BIM services
What you receive

Deliverables, stated before we start.

4D is only useful when the model breaks down the way the programme does. We map the work breakdown structure to model elements first, so the simulation reflects how the job is actually built.

Getting started

What we need from you.

Scope gaps are cheaper to resolve before modelling than after. These are the inputs that set the programme and the price.

Input 01

Programme in Primavera P6 or MS Project with a stable WBS

Input 02

Model at a level of detail that matches the programme granularity

Input 03

Cost breakdown structure and rate basis, for 5D

Input 04

Site constraints, access routes and temporary works intent

Delivered in
  • Bentley SYNCHRO
  • Navisworks TimeLiner
  • Revit
  • Primavera P6
  • MS Project
FAQ

4D & 5D BIM — common questions.

Does my model need to be complete first?

No. It needs to be structured. A schematic model with a sound breakdown sequences better than a detailed model whose elements cannot be mapped to activities.

Is 5D the same as a cost plan?

No. 5D links quantities from the model to your cost structure. The rates, risk and commercial judgement stay with your cost team — we make the quantity side traceable to an element.

Can you update the sequence as the job moves?

Yes. Once the mapping exists, re-running against a revised programme is a maintenance task rather than a rebuild.